Standard evidence audit · dial v4
35/ 100
speculative
model interval 25.3–46.0%
4 computed · 1 prior
Concept viability under named assumptions — NOT a prediction that the craft works in the real world. Computed axes are audits of sealed evidence; PRIOR axes are authored estimates awaiting an instrument; COUNTERFACTUAL axes are what-ifs — the STANDARD verdict is the measurement. E and verification remain separate.
Energy conditions
computed·8%
interval 2–15%no-sealed-metric-floor-v41 evidence ref
Claimed spacetime/field effect has no sealed metric — scored at the ignorance floor. Walls: OQ-001, OQ-002.
Engineering path
computed·55%
interval 45–65%authored prior 10%evidence-counts-v43 evidence refs
make-real-eligible 14% of 7 subsystems (≥E2-V2 gate), sealed geometry 100%, dossier coverage 86%, 2 open OQs. Twin fidelity is not a build path — the make-real term dominates.
interval 40–70%authored-profile-v10 evidence refs
PRIOR — not computed. Claimed coupling has no sealed metric or toy to audit.
interval 1–15%authored prior 15%catalog-weakest-link-v41 evidence ref
negative-energy reservoir (exotic matter): negative-energy reservoir required; no sealed supply audit found — scored at the ignorance floor.
Thermal closure
computed·75%
interval 60–90%authored prior 40%reject-ratio-v43 evidence refs
Radiators reject 1.9e+08 W against 2.42e+08 W declared bus power (ratio 0.78). Rule: propulsion-kind power is open-cycle; bus power must leave as heat at steady state.